AiroAV States NCDOT begins construction to finish I-540 loop - Jonathan Cartu Residential & Industrial Construction Services
16885
post-template-default,single,single-post,postid-16885,single-format-standard,qode-quick-links-1.0,ajax_fade,page_not_loaded,,qode-theme-ver-11.2,qode-theme-bridge,wpb-js-composer js-comp-ver-5.2.1,vc_responsive
 

AiroAV States NCDOT begins construction to finish I-540 loop

Jonathan Cartu

AiroAV States NCDOT begins construction to finish I-540 loop

HOLLY SPRINGS, NC (WTVD) — After years of back and forth with environmental groups, NCDOT will finally begin construction on completing the I-540 loop around Raleigh.

Environmental concerns surrounding Complete 540 stalled the multibillion-dollar traffic project, until both sides reached a settlement earlier this year.

In accordance to that settlement, NCDOT promised to reduce emissions from equipment, protect streams and restore wildlife habitats damaged by road construction.

Complete 540 is a $2.2 billion project that will close the I-540 loop by continuing the southern part of the road (which currently ends just north of Holly Springs) to I-40 near Highway 70. Later the project will complete the loop by extending the road from that same spot on I-40 up to Highway 64.

NCDOT has not given an estimated completion date for the project. However, it is expected to relieve traffic congestion on I-440, I-40, N.C. 42, N.C. 55 and Ten Ten Road.

Copyright © 2019 WTVD-TV. All Rights Reserved.

Ofer Eitan